Abstract Chart of Revenue Recovery (All figures in ₹ Lakhs)
Year | Agriculture | Industrial | Muncipal Corporation/ Nagar Nigam |
C.S.E.B | Other Receipts | Total | |
2002-03 | Target | 4694.35 | 1473.63 | 720.88 | 917.00 | 22.70 | 7828.56 |
Recovery | 890.45 | 1924.43 | 74.50 | 2691.47 | 155.16 | 5736.01 | |
2003-04 | Target | 4517.19 | 2006.26 | 908.70 | 2317.15 | 74.20 | 9823.50 |
Recovery | 2205.75 | 1980.36 | 264.87 | 257.95 | 186.70 | 4895.63 | |
2004-05 | Target | 4537.49 | 2453.14 | 877.57 | 3326.73 | 88.86 | 11283.79 |
Recovery | 1445.88 | 3452.44 | 34.84 | 375.04 | 235.82 | 5544.02 | |
2005-06 | Target | 4621.57 | 2503.85 | 1167.86 | 3077.69 | 122.74 | 11493.71 |
Recovery | 1384.09 | 2627.26 | 45.09 | 66.35 | 225.29 | 4348.08 | |
2006-07 | Target | 4911.66 | 5589.81 | 1390.15 | 4168.46 | 145.51 | 16205.59 |
Recovery | 1017.55 | 5490.08 | 34.00 | 4097.02 | 441.96 | 11080.61 | |
2007-08 | Target | 5593.75 | 5722.54 | 2060.63 | 2462.70 | 97.97 | 15937.59 |
Recovery | 1734.2 | 7276.07 | 19.04 | 2064.41 | 526.39 | 11620.10 | |
2008-09 | Target | 5816.99 | 7873.85 | 2403.52 | 3076.70 | 58.21 | 19229.27 |
Recovery | 1052.93 | 9025.26 | 0.59 | 2839.22 | 380.79 | 13308.79 | |
2009-10 | Target | 6330.11 | 7746.28 | 2828.48 | 3879.22 | 44.95 | 20829.04 |
Recovery | 742.06 | 11072.90 | 22.76 | 2953.08 | 1137.30 | 15928.10 | |
2010-11 | Target | 6822.01 | 22581.14 | 1975.47 | 7309.46 | 54.90 | 38747.98 |
Recovery | 1026.70 | 22486.09 | 28.86 | 3003.64 | 465.05 | 27010.34 | |
2011-12 |
Target |
7869.76 | 29710.88 | 4621.39 | 39557.60 | 65.39 | 81825.01 |
Recovery |
1593.06 | 46469.89 | 13.47 | 5360.32 | 671.55 | 54108.29 | |
2012-13 |
Target |
8371.09 | 36925.69 | 5138.958 | 42766.53 | 972.359 | 94174.63 |
Recovery |
1399.009 | 31484.26 | 2698.62 | 8180.38 | 1778.008 | 46512.64 | |
2013-14 |
Target |
8911.27 | 59.831.59 | 4190.50 | 57067.07 | 302.47 | 130302.90 |
Recovery |
1491.51 | 69729.26 | 72.25 | 8750.33 | 621.84 | 80665.19 |
Detailed Chart of Revenue Recovery (All figures in ₹ Lakhs)
Financial Year |
Arrears as on 01-04-2013 |
Current Demand for 2013-14 | Target for year 2013-14 | Revenue Recovery 2013-14 |
Total Recovery in 2013-14 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2013-14 | Agriculture | 13798.51 | 2514.50 | 8911.27 | 727.42 | 764.15 | 1491.51 | 16.74% |
Industrial | 8531.76 | 51357.60 | 59831.59 | 1283.11 | 69431.41 | 69729.26 | 116.54 % | |
Muncipal Corporation/ Nagar Nigam | 3585.03 | 605.47 | 4190.50 | 9.10 | 63.14 | 72.25 | 1.72% | |
C.S.E.B. | 34671.90 | 22395.17 | 57067.07 | 1087.88 | 7662.45 | 8750.33 | 15.33% | |
Other Receipts | 35.20 | 268.08 | 302.47 | 29.28 | 592.20 | 621.84 | 205.59% | |
Total | 60622.41 | 77140.82 | 130302.90 | 3136.79 | 78513.36 | 80665.36 | 61.91%
|
Financial Year |
Arrears as on 01-04-2012 |
Current Demand for 2012-13 | Target for year 2012-13 | Revenue Recovery 2012-13 |
Total Recovery in 2012-13 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2012-13 | Agriculture | 13055.08 | 2491.828 | 8371.09 | 705.907 | 693.102 | 1399.009 | 16.71% |
Industrial | 4301.457 | 32746.02 | 36925.69 | 112.95 | 30371.31 | 31484.26 | 85.26% | |
Muncipal Corporation/ Nagar Nigam | 4059.813 | 1079.145 | 5138.958 | 1564.6 | 1134.02 | 2698.62 | 49.62% | |
C.S.E.B. | 24704.79 | 17962.91 | 42766.53 | 1734.15 | 6446.23 | 8180.38 | 19.13% | |
Other Receipts | -27.111 | 971.44 | 972.359 | 34.189 | 1743.819 | 1778.008 | 185.14% | |
Total | 46094.029 | 55251.34 | 94174.63 | 4151.796 | 40388.48 | 45540.28 | 71.17% |
Financial Year |
Arrears as on 01-04-2011 |
Current Demand for 2011-12 | Target for year 2011-12 | Revenue Recovery 2011-12 |
Total Recovery in 2011-12 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2011-12 | Agriculture | 11749.74 | 2493.59 | 7869.76 | 783.96 | 809.11 | 1593.06 | 20.24% |
Industrial | 4312.46 | 25398.48 | 29710.88 | 340.57 | 46129.32 | 46469.89 | 156.41% | |
Muncipal Corporation/ Nagar Nigam | 4384.68 | 236.71 | 4621.39 | 5.24 | 8.23 | 13.47 | 0.29% | |
C.S.E.B. | 34346.44 | 5211.16 | 39557.60 | 1853.26 | 3507.06 | 5360.32 | 13.55% | |
Other Receipts | 12.34 | 53.05 | 65.39 | 36.14 | 635.41 | 671.55 | 1026.99% | |
Total | 54805.66 | 33392.98 | 81825.01 | 3019.17 | 51089.13 | 54108.29 | 66.13% |
Financial Year |
Arrears as on 01-04-2010 |
Current Demand for 2010-11 | Target for year 2010-11 | Revenue Recovery 2010-11 |
Total Recovery in 2010-11 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2010-11 | Agriculture | 10466.40 | 1992.21 | 6827.01 | 510.30 | 516.40 | 1026.70 | 15.04% |
Industrial | 1482.61 | 21138.00 | 22581.14 | 427.01 | 22059.08 | 22486.09 | 99.58% | |
Muncipal Corporation/ Nagar Nigam | 3211.74 | 215.98 | 1975.47 | 4.66 | 24.20 | 28.86 | 1.47% | |
C.S.E.B. | 813.01 | 5103.08 | 7309.46 | 348.64 | 2655.00 | 3003.64 | 41.09% | |
Other Receipts | 3.97 | 50.93 | 54.90 | 22.64 | 442.41 | 465.05 | 847.08% | |
Total | 15977.73 | 33542.27 | 38747.98 | 1313.25 | 25699.09 | 27010.34 | 69.71% |
Financial Year |
Arrears as on 01-04-2009 |
Current Demand for 2009-10 | Target for year 2009-10 | Revenue Recovery 2009-10 |
Total Recovery in 2009-10 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2009-10 | Agriculture | 8958.17 | 2309.56 | 6330.11 | 370.13 | 371.93 | 742.06 | 11.72% |
Industrial | 1261.74 | 8227.06 | 7746.28 | 158.84 | 10914.06 | 11072.90 | 142.94% | |
Muncipal Corporation/ Nagar Nigam | 2632.75 | 195.73 | 2828.48 | 6.26 | 16.50 | 22.76 | 0.80% | |
C.S.E.B. | 813.32 | 3065.90 | 3879.22 | 306.13 | 2646.95 | 2953.08 | 76.13% | |
Other Receipts | 33.67 | 44.14 | 44.95 | 13.93 | 1123.37 | 1137.30 | 2530.14% | |
Total | 13699.65 | 13798.25 | 20829.04 | 855.29 | 15070.81 | 15928.10 | 76.47% |
Financial Year |
Arrears as on 01-04-2008 |
Current Demand for 2008-09 | Target for year 2008-09 | Revenue Recovery 2008-09 |
Total Recovery in 2008-09 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2008-09 | Agriculture | 8075.60 | 2259.23 | 5816.99 | 593.98 | 458.95 | 1052.93 | 18.10% |
Industrial | 1020.15 | 7702.20 | 7873.85 | 468.26 | 8557.00 | 9025.26 | 114.62% | |
Muncipal Corporation/ Nagar Nigam | 2037.23 | 394.69 | 2403.52 | 0.28 | 0.31 | 0.59 | 0.02% | |
C.S.E.B. | 698.97 | 2700.21 | 3076.70 | 231.82 | 2907.40 | 2839.22 | 92.28% | |
Other Receipts | 28.56 | 55.35 | 58.21 | 16.17 | 374.62 | 390.79 | 671.34% | |
Total | 11860.51 | 13111.68 | 19229.27 | 1310.51 | 11998.28 | 13308.79 | 69.21% |
Financial Year |
Arrears as on 01-04-2007 |
Current Demand for 2007-08 | Target for year 2007-08 | Revenue Recovery 2007-08 |
Total Recovery in 2007-08 |
% of Revenue Recovery | ||
From Arrears | From current Demand | |||||||
2007-08 | Agriculture | 7499.93 | 2339.93 | 5593.75 | 947.01 | 787.19 | 1734.20 | 31.00% |
Industrial | 921.08 | 5685.47 | 5722.54 | 898.32 | 6377.75 | 7276.07 | 127.15% | |
Muncipal Corporation/ Nagar Nigam | 1621.48 | 439.15 | 2060.63 | 14.31 | 4.72 | 19.04 | 0.92% | |
C.S.E.B. | 106.51 | 2977.25 | 2462.70 | 116.64 | 1947.77 | 2064.41 | 83.83% | |
Other Receipts | 43.31 | 77.52 | 97.97 | 11.36 | 515.03 | 526.39 | 537.29% | |
Total | 10192.31 | 11519.32 | 15937.59 | 1987.65 | 9632.45 | 11620.10 | 72.91% |
Financial Year | Purpose | Arrears as on 01-04-2006 |
Current Demand for 2006-07 |
Target for year 2006-07 | Revenue Recovery 2006-07 |
Total Recovery in 2006-07 |
% of Revenue Recovery | |
From Arrears | From current Demand | |||||||
2006-07 | Agriculture | 6618.65 | 2003.67 | 4911.66 | 452.40 | 565.16 | 1017.55 | 20.72% |
Industrial | 376.17 | 5296.50 | 5589.81 | 334.32 | 5155.76 | 5490.08 | 98.22% | |
Muncipal Corporation/ Nagar Nigam | 1190.25 | 269.34 | 1390.15 | 33.61 | 0.39 | 34.00 | 2.45% | |
C.S.E.B. | 6743.37 | 2650.99 | 4168.46 | 2789.81 | 1307.21 | 4097.02 | 98.29% | |
Other Receipts | 11.68 | 73.40 | 145.51 | 8.99 | 432.97 | 441.96 | 303.73% | |
Total | 14940.12 | 10293.90 | 16205.59 | 3619.13 | 7461.49 | 11080.61 | 68.38% |
Financial Year |
Purpose | Arrears as on 01-04-2005 |
Current Demand for 2005-06 |
Target for year 2005-06 |
Revenue Recovery 2005-06 |
Total Recovery in 2005-06 |
% of Revenue Recovery | |
From Arrears | From current Demand | |||||||
2005-06 | Agriculture | 6115.81 | 1954.47 | 4621.57 | 619.63 | 764.45 | 1384.09 | 29.95% |
Industrial | 340.47 | 2216.23 | 2503.85 | 197.57 | 2429.69 | 2627.26 | 104.93% | |
Muncipal Corporation/ Nagar Nigam | 941.05 | 226.81 | 1167.86 | 42.73 | 2.36 | 45.09 | 3.80% | |
C.S.E.B. | 2502.69 | 575.00 | 3077.69 | 0.00 | 66.35 | 66.35 | 2.16% | |
Other Receipts | 30.69 | 91.77 | 122.74 | 18.45 | 206.84 | 225.29 | 183.55% | |
Total | 9930.71 | 5064.28 | 11493.71 | 878.38 | 3469.69 | 4348.08 | 37.83% |
Financial Year |
Purpose | Arrears as on 01-04-2004 |
Current Demand for 2004-05 |
Target for year 2004-05 |
Revenue Recovery 2004-05 |
Total Recovery in 2004-05 |
% of Revenue Recovery | |
From Arrears | From current Demand | |||||||
2004-05 | Agriculture | 5857.47 | 2010.94 | 4537.49 | 873.59 | 572.29 | 1445.88 | 31.87% |
Industrial | 2357.47 | 2826.05 | 2453.14 | 135.86 | 3316.58 | 3452.44 | 140.74% | |
Muncipal Corporation/ Nagar Nigam | 680.15 | 197.42 | 877.57 | 33.40 | 1.44 | 34.84 | 3.97% | |
C.S.E.B. | 2069.48 | 1257.25 | 3326.73 | 0.00 | 375.04 | 375.04 | 11.27% | |
Other Receipts | 22.86 | 66.00 | 88.86 | 16.03 | 219.79 | 235.82 | 265.38% | |
Total | 10987.43 | 6357.66 | 11283.79 | 1058.88 | 4485.14 | 5544.02 | 49.13% |
Financial Year | Purpose | Arrears as on 01-04-2003 |
Current Demand for 2003-04 |
Target for year 2003-04 |
Revenue Recovery 2003-04 |
Total Recovery in 2003-04 |
% of Revenue Recovery |
|
From Arrears | From current Demand | |||||||
2003-04 | Agriculture | 6707.74 | 2012.89 | 4517.19 | 1535.84 | 669.91 | 2205.75 | 48.83% |
Industrial | 1489.07 | 2564.88 | 2006.26 | 39.46 | 1940.90 | 1980.36 | 98.71% | |
Muncipal Corporation/ Nagar Nigam | 687.09 | 221.61 | 908.70 | 250.73 | 14.14 | 264.87 | 29.15% | |
C.S.E.B. | 1110.15 | 1207.00 | 2317.15 | 89.18 | 168.77 | 257.95 | 11.13% | |
Other Receipts | 0.00 | 74.2 | 74.20 | 4.68 | 182.02 | 186.70 | 251.62% | |
Total | 9994.05 | 6080.58 | 9823.50 | 1919.89 | 2975.74 | 4895.63 | 49.84% |
Financial Year |
Purpose | Arrears as on 01-04-2002 |
Current Demand for 2002-03 |
Target for year 2002-03 |
Revenue Recovery 2002-03 |
Total Recovery in 2002-03 |
% of Revenue Recovery |
|
From Arrears | From current Demand | |||||||
2002-03 | Agriculture | 6159.07 | 2018.51 | 4694.35 | 521.87 | 368.58 | 890.45 | 18.97% |
Industrial | 837.88 | 1610.88 | 1473.63 | 97.64 | 1826.79 | 1924.43 | 130.59% | |
Muncipal Corporation/ Nagar Nigam | 553.20 | 167.60 | 720.88 | 50.66 | 23.84 | 74.50 | 10.33% | |
C.S.E.B. | 0.00 | 917.00 | 917.00 | 1951.49 | 739.98 | 2691.47 | 293.51% | |
Other Receipts | 2.05 | 20.65 | 22.70 | 25.53 | 129.63 | 155.16 | 683.52% | |
Total | 7552.20 | 4734.64 | 7828.56 | 2647.19 | 3088.82 | 5736.01 | 73.27% |
Previous & Existing Water Rates of Crops Irrigation From Govt. Sources. | |||
S.No | Crop | RATE in INR ₹ (Per Acre) |
|
Previous (Since 1.10.84) | Existing (Since 15.06.99) | ||
Name of crop - RABI | |||
1 | Rice | 90.00 | 200.00 |
2 | Wheat | ||
Maximum Three Irrigation (Including Land Preparation) | - | 81 | |
Every Extra Water Demand | - | 25 | |
3 | Groundnut, Sunflower, Soya bean | 24.00 | 100.00 |
4 | Gram, Moong & Tether pulses. | 17.00 | 100.00 |
5 | Coriander | 50.00 | 100.00 |
6 | Barley | 20.00 | 200.00 |
Name of crop - KHARIF | |||
7 | Long Term Agreement | 22.00 | 81.00 |
Demand | 24.00 | 89.00 | |
8 | Groundnut, Soyabean | 18.00 | 50.00 |
9 | Bar seem Grass, (Fodder Crop) | 50.00 | 150.00 |
10 | Banana, beetal, Garden Crops, Rubber plant, Sugar cane. | 120.00 | 300.00 |
11 | Brinjal, Carrot, Cauliflower, Chilly, Cucumber, Dalocasia, Fenngreek, Ginger, Garlic, Gwarfalli, Ladies finger, Pea, Poppy seeds, Pumpkin, Potato, Radish, Spinach, Tobacco, Tomato, Turmeric, Water melon, Green vegetables. | 120.00 | 200.00 |
12 | Cotton Ordinary | 24.00 | 70.00 |
Hybrid | 37.50 | 150.00 | |
13 | Khaskhas & Tobacco | 27.00 | 200.00 |
14 | Water for Land Preparation(PALEWA) | 12.00 | 40.00 |
छत्तीसगढ़ सिंचाई अधिनियम - 1931 (क्र.-3, सन् 1931) के अधीन विरचित नियमों के उपबंधों के साथ पठित उक्त अधिनियम की धारा-37 तथा 40 द्वारा प्रदत्त शक्तियों को प्रयोग में लाते हुए जल संसाधन विभाग की अधिसूचना क्रमांक-3843/7-ए/जसं./तशा/औजप्र/02/डी-4, रायपुर दिनांक 31-05-2010 को अधिष्ठित करते हुए, राज्य सरकार एतद् द्वारा संपूर्ण राज्य में औद्योगिक प्रयोजन, ताप विद्युत तथा जल विद्युत परियोजनाओं के लिए निम्नलिखित जल-दर निर्धारित करती हैः-
स.क्र. | उपयोग का प्रकार | विशेष विवरण | जल दर | |
1 | 2 | 3 | 4 | |
1. | औद्योगिक प्रयोजन/ताप विद्युत प्रयोजन | अ | शासकीय स्रोत :- | |
1. | बांध/जलाशय/बैरॉज/ एनीकट आदि से ... | |||
i) | विभागीय मद से निमिर्त जल संग्रहण संरचना से.. |
रु. 10.50 प्रति घ.मी. |
||
ii) | संस्थानों की अग्रिम जल_कर की राशि से निमिर्त जल संग्रहण संरचना से.... |
रु. 5.50 प्रति घ.मी. |
||
2 |
नहर प्रणाली से........ |
रु. 12.25 प्रति घ.मी. |
||
ब |
नैसगिर्क/स्वनिर्मित स्रोत से.... |
रु. 3.51 प्रति घ.मी. |
||
2.
|
जल विद्युत प्रयोजन (जल के उपयोग पश्चात पुन: प्राप्ति) (क) 25 मे.वा. से अधिक क्षमता की लघु जल विद्युत पऱि |
अ | शासकीय स्रोत :- | |
1. | बांध/जलाशय/बैरॉज/ एनीकट आदि से ... | रु. 1.07 (एक रु. सात पैसे)/विद्युत इकाई उत्पादन एवं 200 (दो सौ){ पैसे/100 वि.ई.उ. पर प्रति वर्श एस्केलेशन चार्जेस | ||
2 |
नहर प्रणाली से........ |
रु. 1.25 (एक रु. पच्चीस पैसे)/ विद्युत इकाई उत्पादन एवं 250 (दो सौ पचास){ पैसे/100 वि.ई.उ. पर प्रति वर्श एस्केलेशन चार्जेस | ||
ब |
नैसगिर्क/स्वनिर्मित स्रोत से.... |
रु. 0.35 (पैतीस पैसे){/वि.ई.उ. पर | ||
(ख) 25 मे.वा. या उससे कम क्षमता की लघु जल विद्युत परियोजनायें | शासकीय स्रोत/ नैसगिर्क/ स्वनिमिर्त आदि विभिन्न स्रोत से... | रु. 0.06 (छ: पैसे) |
क्रमांक. 213/7-ए/जसं./तशा/ डी-4/औजप्र/01, दिनांक 16/01/2020
छत्तीसगढ़ सिंचाई अधिनियम-1931 (क्र.-3, सन् 1931) के अधीन विरचित नियमों के उपबंधों के साथ पठित उक्त्त अधिनियम की धारा-37 तथा 40 द्वारा प्रदत्त शक्तियों को प्रयोग में लाते हुए जल संसाधन विभाग की अधिसूचना क्रमांक-812/7-ए/जसं./तशा/डी-4/औजप्र/ 01. दिनांक 24.02.2016 को अधिष्ठित करते हुए. राज्य सरकार एतद द्वारा संपूर्ण राज्य में औद्योगिक प्रयोजन, ताप विद्युत तथा जल विद्युत परियोजनाओं के लिये निम्नलिखित जल-दर निर्धारित करती है-
स.क्र. | उपयोग का प्रकार | विशेष विवरण | जल दर | |
1 | 2 | 3 | 4 | |
1. | औद्योगिक प्रयोजन/ताप विद्युत प्रयोजन | अ | शासकीय स्रोत :- | |
1. | बांध/जलाशय/बैरॉज/एनीकट आदि से ... | |||
i) | शासकीय मद से निमिर्त जल संग्रहण संरचना से.. |
रु. 10.50 प्रति घ.मी. |
||
ii) | संस्थानों की अग्रिम जल_कर की राशि से निमिर्त जल संग्रहण संरचना से.... |
रु. 10.50 प्रति घ.मी. |
||
2 |
नहर प्रणाली से........ |
रु. 12.25 प्रति घ.मी. |
||
ब |
नैसगिर्क/स्वनिर्मित स्रोत से.... |
|
||
i) | नदी/नाले आदि के बहाव से... | रु. 5.00 प्रति घ.मी. | ||
ii) | भू_जल से....... | रु. 15.00 प्रति घ.मी. | ||
2. | ऐसे उद्योग (जैसे कोल्ड ड्रिंक्स, मिनरल वॉटर, शराब आदि) जो जल का उपयोग कच्चे माल (Raw Material) के रुप में करते हैं....... | अ | शासकीय स्रोत :- | |
1. | बांध/जलाशय/बैरॉज/एनीकट आदि से ... | |||
i) | शासकीय मद से निमिर्त जल संग्रहण संरचना से.. |
रु. 250.00 प्रति घ.मी. |
||
ii) | संस्थानों की अग्रिम जल_कर की राशि से निमिर्त जल संग्रहण संरचना से.... |
रु. 250.00 प्रति घ.मी. |
||
2 |
नहर प्रणाली से........ |
रु. 300.00 प्रति घ.मी. |
||
ब |
नैसगिर्क/स्वनिर्मित स्रोत से.... |
|
||
i) | नदी/नाले आदि के बहाव से... | रु. 125.00 प्रति घ.मी. | ||
ii) | भू_जल से....... | रु. 375.00 प्रति घ.मी. | ||
3.
|
जल विद्युत प्रयोजन (जल के उपयोग पश्चात पुन: प्राप्ति)
(क) 25 मे.वा. से अधिक क्षमता की लघु जल विद्युत पऱि |
अ | शासकीय स्रोत :- | |
1. | बांध/जलाशय/बैरॉज/ एनीकट आदि से ... | रु. 1.07 (एक रु. सात पैसे) /विद्युत इकाई उत्पादन एवं 200 (दो सौ) पैसे/100 वि.ई.उ. पर प्रति वर्श एस्केलेशन चार्जेस | ||
2 |
नहर प्रणाली से........ |
रु. 1.25 (एक रु. पच्चीस पैसे) / विद्युत इकाई उत्पादन एवं 250 (दो सौ पचास) पैसे/100 वि.ई.उ. पर प्रति वर्श एस्केलेशन चार्जेस | ||
ब |
नैसगिर्क/स्वनिर्मित स्रोत से.... |
रु. 0.35 (पैतीस पैसे)/वि.ई.उ. पर | ||
(ख) 25 मे.वा. या उससे कम क्षमता की लघु जल विद्युत परियोजनायें | शासकीय स्रोत/ नैसगिर्क/ स्वनिमिर्त आदि विभिन्न स्रोत से... | रु. 0.06 (छ: पैसे) |
Industrial Water Rate Revision Notification 16 January, 2020